Asbestos Removal Projects

Project:

Ross Building - Floors - 1, 3, 4, 5, 6, 7, 8, 9

Contact:

Steve Sicluna

Project Coordinator/Planner:

Theo Arvanitis, extension 22502

Description of work:

Type 2 Asbestos; project to commence December 21, 2006 and continue to March 30, 2007

Removal process:

Following removal procedures of Type 2 (see page 18) as indicated in the REGULATIONS RESPECTING ASBESTOS (O.Reg.278)

Type of Asbestos:

Asbestos ceiling tiles

Chemical Names:

.5% Amosite
.5-5% Chrysotile

Documentation:

Consultants Inspection Report
Inspection & Air Sampling Results - South, Ground Floor (Dec. 22/06)
Inspection & Air Sampling Results - South, Ground Floor (Dec. 27/06)
Inspection & Air Sampling Results - South, Ground Floor (Dec. 28/06)
Inspection & Air Sampling Results - South, Ground Floor (Dec. 29/06)
Inspection & Air Sampling Results - South, Ground Floor (Jan. 5/07)
Inspection & Air Sampling Results - South, Ground Floor (Jan. 6/07)
Inspection & Air Sampling Results - North, Third Floor (Jan. 12/07)
Inspection & Air Sampling Results - North, Third Floor (Jan. 13/07)
Inspection & Air Sampling Results - South, Fourth Floor (Jan. 19/07)
Inspection & Air Sampling Results - South, Fourth Floor (Jan. 20/07)
Inspection & Air Sampling Results - South/North, Fourth Floor (Jan. 26/07)
Inspection & Air Sampling Results - South/North, Fourth Floor (Jan. 27/07)
Inspection & Air Sampling Results - South/North, Fourth Floor (Feb. 2/07)
Inspection & Air Sampling Results - South/North, Fourth/Fifth Floor (Feb. 3/07)
Inspection & Air Sampling Results - South/North, Fifth Floor (Feb. 9/07)
Inspection & Air Sampling Results - South/North, Fifth Floor (Feb. 10/07)
Inspection & Air Sampling Results - South, Third Floor (Feb. 15/07)
Inspection & Air Sampling Results - South, Fifth Floor (Feb. 16/07)
Inspection & Air Sampling Results - South, Fifth Floor (Feb. 17/07)
Inspection & Air Sampling Results - South, Sixth Floor (Feb. 23/07)
Inspection & Air Sampling Results - South, Sixth Floor (Feb. 24/07)
Inspection & Air Sampling Results - North, Seventh Floor (Feb. 28/07)
Inspection & Air Sampling Results - Seventh Floor (March 1/07)-No work due to inclement weather
Inspection & Air Sampling Results - North, Fourth/Sixth Floor (Mar. 2/07)
Inspection & Air Sampling Results - North, Sixth Floor (Mar. 3/07)
Inspection & Air Sampling Results - North, Ninth Floor (Mar. 15/07)
Inspection & Air Sampling Results - North, Eighth Floor (Mar. 16/07)
Inspection & Air Sampling Results - North, Eighth Floor (Mar. 17/07)
Inspection & Air Sampling Results - South, Eighth Floor (Mar. 23/07)
Inspection & Air Sampling Results - South, Eighth Floor (Mar. 24/07)
Inspection & Air Sampling Results - South, Eighth/Ninth Floor (Mar. 29/07)
Inspection & Air Sampling Results - South, Eighth Floor (Mar. 30/07)
Inspection & Air Sampling Results - South, Eighth Floor (Mar. 31/07)

Clearance Results Testing:

In addition to these measures air testing will be preformed although not required in these regulations. A report will be submitted proceeding this work and will be provided to Facilities Services.


Project:

Winters College

Contact:

Sean Thibeault

Project Coordinator/Planner:

Sean Thibeault, extension 22501

Description of work:

Winters College Construction Area only - mechanical elbow abatement, VAT flooring removal through out 1st floor and south basement construction areas only.

Removal process:

Following removal procedures of Type 3 (see page 18) as indicated in the REGULATIONS RESPECTING ASBESTOS (O.Reg.278)

Type of Asbestos:

Mechanical insulation, VAT floor tiles

Chemical Names:

Documentation:

Preabatement Inspection Report - One Two
Inspection & Air Sampling Results - South, Basement (Apr. 10/07)
Preabatement Inspection Report - First Floor
Inspection & Air Sampling Results - First Floor (Apr. 18/07)
Inspection & Air Sampling Results - Basement (May 14/07)

Clearance Results Testing:

In addition to these measures air testing will be preformed although not required in these regulations. A report will be submitted proceeding this work and will be provided to Facilities Services.


Project:

HNES

Contact:

Blair Price/Travis Ferguson

Project Coordinator/Planner:

Blair Price, extension 55716 or cell: (416)984-8975

Description of work:

Remove chrysotile asbestos from steam piping and elbows in PRV room on May 5, 2007 after 6pm

Removal process:

Following removal procedures of Type 3 (see page 18) as indicated in the REGULATIONS RESPECTING ASBESTOS (O.Reg.278)

Type of Asbestos:

Mechanical insulation, chrysotile asbestos

Chemical Names:

Documentation:

Inspection & Air Sampling - Basement, HNES (May 5-6, 2007)

Clearance Results Testing:

In addition to these measures air testing will be preformed although not required in these regulations. A report will be submitted proceeding this work and will be provided to Facilities Services.


Project:

Winters College - Basement Corridor Pub Entrance

Contact:

Sean Thibeault

Project Coordinator/Planner:

Sean Thibeault, extension 22501

Description of work:

Abate Asbestos plaster ceiling in corridor at pub entrance to allow for new mechanical services for part of Winters College renovation project.

Removal process:

Following removal procedures of Type 3 (see page 18) as indicated in the REGULATIONS RESPECTING ASBESTOS (O.Reg.278)

Type of Asbestos:

Chrysotile asbestos

Chemical Names:

Documentation:

Inspection & air sampling results at completion of Type 3 abatement along with clearance certificate. (see attached)

Clearance Results Testing:

 

 

 

 

maintenance, utilities and energy

top news
Maintenance Home
Maintenance Zones and Supervisors
Asbestos
Key Control
 
Key Control Home
Key Information
Work Control Centre
 
Work Control Centre Home
Priority Levels
Customer Feedback
bottom news
Y graphic


graphic rule