Skip to main content Skip to local navigation
Home » Program-level expectations

Program-level expectations

 The Teaching Commons can assist units in one of two ways: 

  1. Educator survey followed by a workshop: The Teaching Commons can co-develop a survey for the unit, gather and complete a preliminary analysis, in consultation with curriculum committee designate(s). The compiled results will then be presented to the unit at a workshop. The lead time required for this option is approximately 4-6 weeks.
  2. Stand-alone workshop: If it is not possible to gather information ahead of time, the Teaching Commons can facilitate an informal process of refining program learning outcomes in a workshop. The lead time required is 2-4 weeks.